Northeastern University: educating our future
Page 1 of 0
Northeastern University’s Facilities Division is responsible:
Planning, design and construction of new buildings
Extension, renewal and replacement of existing plant facilities
Prudent use of energy through the efficient operations of the campus utility distribution systems
The group manages 150-200 capital projects every year that range in cost from $20,000 to $200 million for customers that include the University Board of Directors to the nine individual colleges and schools.
Learn how Northeastern University used Trimble Unity Connect, powered by e-Builder to reduce project cost and shorten their project schedules.